
Tilal City, Sharjah
villa, apartment
2, 3, 4, 5, 6
9,235 sqft
Sequoia is the sixth phase of the award-winning Masaar master community by Arada, located in the green heart of Sharjah. Designed as a sanctuary for modern families, Sequoia offers a calm and elegant lifestyle set within lush forested surroundings. With over 50,000 trees, Masaar is one of the most nature-focused communities in the UAE, and Sequoia continues this legacy by offering high-quality homes surrounded by greenery, tranquility, and wellness-focused living. This gated community perfectly combines sustainability, smart design, and contemporary architecture in a serene, walkable neighborhood. Sequoia features a premium selection of 2, 3, 4, and 5-bedroom townhouses and villas, each with smart home features, private gardens, floor-to-ceiling windows, and premium finishes. Larger villas include maid’s rooms, driver’s rooms, and optional private swimming pools. Residents enjoy direct access to Masaar’s extensive forest park, outdoor sports facilities, cycling and jogging tracks, community pools, and the Masaar Central Hub, home to shops, cafes, restaurants, a fitness center, and a children’s adventure park. The community also includes a school, mosque, and wellness offerings designed to enhance both body and mind. Sequoia is located in Al Suyoh, Sharjah, just minutes from key transport corridors including Emirates Road (E611) and Maliha Road. It provides excellent connectivity to both Sharjah and Dubai, with fast access to Sharjah International Airport, University City, Downtown Dubai, and Dubai International Airport. The location offers a peaceful retreat with the convenience of city access, ideal for both end-users and investors. Developed by Arada, the UAE’s fastest-growing master developer, Masaar is a testament to their vision of building sustainable, people-first communities. With successful projects like Aljada and Jouri Hills, Arada has established a strong reputation for delivering homes that are intelligent, beautifully designed, and built around wellness. Sequoia is scheduled for completion in Q2 2026, with a flexible 40/60 payment plan and premium build quality.
Type
villa
Furnishing
semi-furnished
Added on
29 July 2025
Handover Date
Q3 2025
Completion
Under Construction
Developer
Arada Living
Ownership
Freehold
Built-up Area
NOT PROVIDED
Total Parking Spaces
NOT PROVIDED
Total Floors
NOT PROVIDED
Total Building Area
NOT PROVIDED
Retail Centres
NOT PROVIDED
Elevators
NOT PROVIDED
Swimming Pools
NOT PROVIDED
Search Id
S8661H
Project No
NOT PROVIDED


2 mins to Nasma Central Park
2 mins to Tilal Mall
20 mins to Dubai International Airport
Swimming Pool
Gym
Covered Car Park
Dining Outlets
Gardens and Parks
Private Lift
5% Down payment
40% During construction
55% On handover
Total Loan Amount

1, 2
14
950 sqft
International City, Dubai

4
2
3,652 sqft
Dubai Investment Park, Dubai

1, 2
7
1,700 sqft
City Of Arabia, Dubai

Studio, 1, 2
6
0 sqft
Dubai South, Dubai

1, 2, 3
10
1,819 sqft
Meydan, Dubai

1, 2, 3, 4
6
3,434 sqft
Al Mamzar, Sharjah

Studio, 1, 2
4
972 sqft
Dubai South, Dubai

Studio, 1, 2
6
1,295 sqft
Dubai International City 2, Dubai

Studio, 1, 2
1,426 sqft
Dubai Industrial City, Dubai

Studio, 1
5
808 sqft
International City, Dubai

1, 2, 3
5,542 sqft
Maritime City, Dubai

Studio, 1, 2, 3
15
1,400 sqft
Sheikh Zayed Road, Dubai



